Emergency Construction Monitoring & Rapid Mobilization in NYC

Facing an urgent NYC DOB inspection, Stop Work Order, or excavation compliance requirement? Saltus deploys experienced field technicians and real-time monitoring systems across all five boroughs within 24 hours—delivering defensible data to keep your project safe, compliant, and moving.

When Every Hour Counts (Trigger Scenarios)

DOB Inspection Sweeps & Audits:

Rapid instrumentation and baseline documentation to satisfy heightened DOB scrutiny on active excavation, demolition, and underpinning sites.

Stop Work Order (SWO) Resolution:

Fast-track installation of required vibration, optical, and crack monitoring to meet engineer and DOB sign-off conditions.

Adjacent Structure & Foundation Concerns:

Immediate deployment of tiltmeters and optical targets when neighboring masonry walls or foundations show signs of stress.

Missing or Incomplete Monitoring Plans:

End-to-end execution of project-specific monitoring protocols aligned with NYC Building Code Chapter 33 and TPPN 10/88 requirements.

Rapid-Deployment Capabilities

  • Wireless & Manned Vibration Monitoring: Continuous peak particle velocity (PPV) tracking with instant SMS/email threshold alerts to prevent damage before it occurs.

  • Optical Structural Surveying: Automated and manual total-station target monitoring to detect vertical settlement or lateral movement on adjacent structures.

  • Wireless Tiltmeter Monitoring: High-precision sensors installed on corners and facade lines to serve as an early warning system for structural rotation or inclination.

  • Crack Gauge Monitoring: Calibrated tell-tale and electronic crack gauges with documented photographic tracking to verify whether existing cracks are active.

  • Existing Conditions Documentation: Rapid photographic and video pre-construction/current-condition surveys to establish an objective baseline and protect against unwarranted claims.

  • DOB-Ready Compliance Reporting: Formalized, defensible PDF reports formatted for submission to the DOB, MTA, and engineers of record.

How Our Emergency Mobilization Works (3-Step Process)

  1. Immediate Scope & Plan Review: Share your Support of Excavation (SOE) drawings, monitoring plan, or DOB violation notice. Our team confirms instrument quantities and placement locations right away.

  2. Rapid Field Deployment & Neighbor Coordination: Our NYC technicians deploy to the site, executing clean, minimally invasive installations and coordinating professionally with adjacent property owners to avoid access bottlenecks.

  3. 24/7 Live Alerts & Defensible Reporting: Automated threshold alerts notify your superintendent and engineer in real time, backed by routine compliance reports ready for DOB inspection.

 

Project Examples

1717 Broadway Street,
New York, NY

1717 Broadway Street,
New York, NY

Learn More

136-140 W. 42nd Street,
New York, NY

136-140 W. 42nd Street,
New York, NY

Learn More

51 Jay Street,
Brooklyn, NY

51 Jay Street,
Brooklyn, NY

Learn More

Contact Us Today

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero